PCC IMM
/
Buyers
/
Mansard Engineering
K
—
quoted
warm path
Oil & Gas
Mansard Engineering
Mansard Industrial Engineering Ltd · RC 1102983 · Port Harcourt, Rivers
Tier-1 OEM rep + service contractor (warm)
Pause outreach
Hand off to PCC
Compose
Fit
83
Urgency
75
Est. value
$36.6k
Active deals
0
Signals
6
Last signal
1mo ago
Last action
1mo ago
Contacts · 1
Name
Title
Channel
Email
Phone
Source
Kelechi Mba
primary
Operations Director
linkedin
kelechi.mba@mansardindustr.com
+234 837 559 1960
company_site
Latest Conversation
linkedin · 4 messages · awaiting buyer
Mechanical seal availability
active
AG
Agent (PCC IMM)
·
Apr 25, 23:38
·
linkedin
Hi — confirming we have the part in Onne stock. Would 7-day delivery work for your team?
AG
Agent (PCC IMM)
·
Apr 30, 22:38
·
linkedin
Sharing spec sheet attached. Flow rate 350m³/h at 65m head fits your duty point. Lead time ex-Apapa is 14 days.
MA
Mansard Engineering
·
May 03, 04:38
·
linkedin
Pricing looks high. Can you do better on volume?
MA
Mansard Engineering
·
May 05, 18:38
·
linkedin
Need to align with our maintenance team. Will revert by EOW.
Deals · 1
SKU
Stage
Qty
Unit price
Est. value
Margin
Last action
JC-TYPE8B15-1034
John Crane Type 8B1 cartridge seal, 50mm, single, balanced
lost
3
$3,450
$10.3k
18.3%
1mo ago
Score Breakdown
Fit · 83 / 100
83
Urgency · 75 / 100
75
Matched SKUs
G-CR6442AF-1025
Grundfos CR vertical multi-stage, 64-4-2, high-pressure water
available
·
6 on hand
·
$9,200
AES-T0180MM-1047
AESSEAL T01 single cartridge, 80mm, general process
available
·
23 on hand
·
$3,600
G-NK802002-1026
Grundfos NK end-suction, 80-200/210, general water duty
available
·
5 on hand
·
$8,400
JC-TYPE8B15-1034
John Crane Type 8B1 cartridge seal, 50mm, single, balanced
available
·
11 on hand
·
$3,450
Signals · 6
Contract awarded: Rotating equipment overhaul — Mansard Engineering
NOCOPO
·
NOCOPO/2026/60438
·
1mo ago
Contract awarded: Maintenance services — Mansard Engineering
NOCOPO
·
NOCOPO/2024/90257
·
1mo ago
PML renewed for Mansard Engineering — OML 30
NUPRC
·
NUPRC/PPL/2024/833
·
1mo ago
Mansard Engineering CEO interview — decarbonization plans
AOGR
·
AOGR-EXEC-888
·
1mo ago
Train shutdown at Mansard Engineering — Train 3 trip
EnergyMix
·
EM-2026-7491
·
2mo ago
Mansard Engineering CEO interview — local content commitments
AOGR
·
AOGR-EXEC-412
·
2mo ago
Agent Activity
Qualified Mansard Engineering — moved to pipeline
Confirmed active maintenance window.
qualification
·
1mo ago